Room air distributionZoned heating and cooling

Designing with active chilled beams

Induction, primary air, dew point control and rated performance

71.75–73.25 min PDH

About this presentation

A technical seminar for consulting engineers and owners on active chilled beams: ceiling terminals in which ducted primary air, discharged through nozzles, induces room air across a dry water coil. It covers what the beams are and where they fit; why moving heat with water instead of air saves duct space and fan energy, and what the published energy studies do and do not show; how induction, the room air pattern and the split between air-side and water-side cooling work; and how to design a system: zone loads, primary airflow and dew point, condensation control, beam selection and layout, heating, medium-temperature chilled water, piping, zone valves and commissioning. It closes with how beams are designed and tested to ASHRAE Standard 200, what a rating to AHRI Standard 1240 promises and how to specify it, and project examples.

Learning objectives

  1. Explain how an active chilled beam uses primary air to induce room air across a dry coil.
  2. Identify the buildings and spaces that suit active beams, and those that do not.
  3. Size primary airflow and set water temperatures that keep the coil dry.
  4. Lay out beams for cooling and heating, and plan the medium-temperature water system, zone valves and commissioning.
  5. Describe how beams are tested to ASHRAE 200 and rated to AHRI 1240, and what to specify.

Topics

  • active chilled beam
  • chilled beam
  • induction
  • primary air
  • dedicated outdoor air
  • dew point
  • condensation control
  • medium-temperature chilled water
  • six-way valve
  • ASHRAE 200
  • AHRI 1240
  • ASHRAE 170