Humidification and humidity controlHeat recoveryZoned heating and cooling
Dew point design for dedicated outdoor air systems
Why DOAS buildings run humid, three laws of design, AHRI 920 and specifying part load
About this presentation
A technical seminar for consulting engineers, owners and contractors on designing dedicated outdoor air systems (DOAS) that hold indoor humidity at every load. It explains why buildings that pair a DOAS with fan coils, VRF, unit ventilators or chilled beams so often run humid: outdoor air dried only to a neutral dew point, terminal units that follow the thermostat and lose their dehumidification at part load, and units selected at one full-load point and judged by an air-conditioner metric. It sets out three laws of dew point design and works a classroom example from ASHRAE 62.1 ventilation rates to the required supply-air dew point, then covers how dry a coil can practically go, terminal unit sizing, cold or neutral supply air, energy recovery, reheat and the ASHRAE 90.1 limits on it, and dew point control sequences. It compares AHRI 340/360 and IEER with AHRI 920 and its MRC, MRE, ISMRE2 and ISCOP2 metrics, and explains the federal DX-DOAS efficiency standards and AHRI certification. It closes with a Philadelphia weather analysis that shows most dehumidification hours are part-load hours, and with how to schedule and specify part-load performance.
Learning objectives
- Explain why outdoor air dried only to a neutral dew point lets indoor humidity rise at part load.
- Calculate the supply-air dew point that carries a room's latent load.
- Apply three laws of dew point design, within ASHRAE 62.1 and 90.1 humidity limits, to the DOAS, the terminal units, reheat and controls.
- Distinguish AHRI 340/360 and AHRI 920 ratings, and explain the federal DX-DOAS minimums and what AHRI certification verifies.
- Specify part-load DOAS performance with schedule rows based on hourly weather data.